Stay Ahead in Fast-Growing Economies.

Browse Reports Now

Data Center Construction Market – Latest Advancement And Analysis

In Stock
$3,090
In Stock

A cutting-edge space called a data centre is utilized to manage computer systems and other IT-related equipment. The data center’s design allows for airflow underneath the floor and tiles. An increase in the volume of data is brought on by a considerable increase in internet usage, sophisticated software development and installation methods, and an increase in the number of devices connected to both public and private networks. The collection of procedures used to actually build a data centre facility is known as data centre construction. 10

Publication Date: 01/11/2025
Pages: 400
Region / Coverage: Global
In Stock
Country: Global
Product total
Options total
Grand total
Add to wishlist
IMR Group
Publisher:

IMR Group

Tag:

Description

Data Center Construction Market Synopsis

Data Center Construction Market Size is Valued at USD 293.49 Billion in 2024 and is Projected to Reach USD 443.63 Billion by 2032, Growing at a CAGR of 5.30% From 2025-2032.

The data center construction market encompasses the activities associated with the development, construction, design, and upkeep of data centers. These establishments are crucial for the housing of networking apparatus, computing systems, storage, and other components required for data management and processing. The market comprises a wide range of products and services, such as security infrastructure, site selection, architecture, power supply, and ventilation systems. The data center construction market is undergoing substantial expansion due to the rising demand for cloud computing and digital services. This growth is fueled by various factors, including the proliferation of IoT devices, the expanding volume of data, and the necessity for streamlined data management solutions.

The market for data center construction is propelled by a number of significant factors. To begin with, the expanding requirements for data storage and processing capacities—propelled by the development of big data analytics, cloud computing, and the Internet of Things (IoT)—are stimulating the demand for novel data centers. As an effort to manage the daily influx of vast amounts of data, businesses are expanding their digital infrastructure, which is accelerating the development of new data centers.

Secondly, technological advancements are also propelling market expansion. Construction activities are being driven by innovations such as edge computing, which relocates processing to the location of data origin, and the implementation of modular data center designs that offer flexibility and scalability. Additionally, the emphasis on sustainability and energy efficiency is influencing the design and construction of data centers, with businesses utilizing energy-efficient technologies and green building practices to reduce their operating expenses and environmental impact. The projected expansion of the Data Center Construction Market is attributed to factors such as the escalating demand for data storage, technological progress, and the growing emphasis on environmentally sustainable building methods.

Data Center Construction Market Trend Analysis

Building Tomorrow’s Data Centers, Trends and Innovations

The global data center construction market is currently undergoing significant expansion due to the rapid growth of cloud computing, big data analytics, and the expanding use of Internet of Things (IoT) devices. In addition to the proliferation of digitalization across industries, the need for secure and efficient storage solutions further stimulates the demand for data centers. In an effort to optimize operational performance and facilitate growth, enterprises are making substantial financial commitments towards the establishment of fresh data centers or the enlargement of pre-existing infrastructure.

Furthermore, an increasing consciousness regarding ecological concerns is propelling the market towards a transformation in the way data centers are build. Organizations are placing a greater emphasis on green data center initiatives as a means to attain energy efficiency and reduce their carbon footprint. It is anticipated that this development will spur innovation in the construction of data centers, placing a greater emphasis on eco-friendly building materials, efficient ventilation systems, and renewable energy sources.

Meeting Demand, Growth Opportunities in Data Center Construction

The Data Center Construction Market offers a strong prospective that is fueled by the rising need for data storage and computing solutions. The rapid advancement of cloud computing, big data analytics, and IoT have made data centers a critical component in today’s technology infrastructure. Some of these factors that are driving the need for such a solution include the rise in the use of digital services, new and emerging trends in working from home or remotely, and the increasing use of smart devices.

Also, the emissions in the market are moving towards more energy-efficient and sustainable data center designs. This change is precipitated by the current pressures that come with environmental conservation, legal compliance, and the ever-increasing operating expenses. Therefore, there is an increased need for improved construction technologies that can facilitate the improvement of cooling efficiency, the use of renewable energies, and efficient layout designs. Such solutions are ideal for firms that are in a position to gain from the changes that are taking place in this market environment.

Data Center Construction Market Segment Analysis:

Data Center Construction Market is Segmented on the basis of Infrastructure, Type, End User and Region.

By Type, Tier-I and Tier-II segment is expected to dominate the market during the forecast period

The Data Center Construction Market can be classified into various categories as per their architecture and functionality. These are known as ‘Tier-I’ and ‘Tier-II’ data centers and are characterized by low degrees of redundancy and availability. They are common for small companies or in cases where the system is not crucial for the company’s operations.

On the other hand, Tier-III data centers are built to offer a better level of availability through having more than a single distribution of power and cooling paths, as well as multiple components. These data centers are ideal for business entities whose operations cannot afford to be interrupted for critical applications.

Tier-IV data centers provide the highest degree of availability and reliability, featuring multiple copies of systems and components which can operate continuously while others are being serviced or replaced. These are data centers that are mainly deployed in large companies and organizations with critical business functions. The analyzed market of data center construction is present at all tiers, and it is driven by the need to provide IT infrastructure that is reliable, efficient, and scalable for the constantly expanding digital economy.

By Infrastructure, General Construction segment held the largest share in 2024

The infrastructure components comprising the Data Center Construction Market are all vital to the functioning of a data center. The aforementioned elements can be classified into three overarching categories: mechanical infrastructure, electrical infrastructure, and general construction.

Power distribution units, uninterruptible power supply (UPS) systems, generators, and electrical wiring are all elements of electrical infrastructure. These components are of the utmost importance in guaranteeing the data center apparatus a dependable and continuous power supply.

Mechanical infrastructure consists of elements associated with ventilation and cooling systems, such as chillers, circulation management systems, and air conditioning units. These elements are critical for sustaining ideal operating temperatures in the data center in order to avert apparatus overheating and guarantee effective functioning.

The tangible infrastructure and facilities of the data center, including the building envelope, flooring, walls, and ceilings, are included in general construction. In addition, environmental controls, fire suppression systems, and security systems are incorporated to safeguard the data center and its equipment against external threats.

Every individual infrastructure component listed above is crucial to the overall functionality and effectiveness of a data center. As the digital economy continues to expand, data center construction companies have the opportunity to profit from the increasing demand for these components.

Data Center Construction Market Regional Insights:

North America is Expected to Dominate the Market Over the Forecast period

The demand for data storage and processing is increasing and, as a result, the construction of data centers in North America is a rapidly growing and highly active segment. The area attracts many large industry players, including construction, technology, and data center, making for a competitive region.

One of the primary drivers of the growth of data center construction industry in North America is the rise in the use of cloud services. As consumers and businesses are relying more on cloud storage solutions and applications, more data centers are needed to support this service. Thirdly, the need for data center infrastructure has been occasioned by the growth of data centric technologies such as Artificial Intelligence, Internet of Things (IOT) and Big Data Analytics.

Another important factor that is driving the market growth is the increasing concern towards energy saving and sustainability. As some of the most energy-hungry facilities, data centers therefore attract efforts to design and construct more efficient structures. This entails the adoption of complex cooling solutions, green power, and power-efficient hardware and equipment to reduce environmental effects and operating costs.

The North America market is also characterized by the constant evolution of both the design and construction of data center construction. The use of advanced project management solutions, pre-fabricated elements and modular construction has become more widespread in an attempt to increase productivity and reduce the costs of projects.

However, there are challenges that are faced by the market and these include; regulation, shortage of land in urban areas, and specialized labor. In addition, COVID-19 has affected supply chain and construction projects by disrupting the construction projects.

The rising adoption of digital services, the new era of the cloud, and the need for greener and smarter data center solutions are expected to continue to propel the North American data center construction market in the future years. It is expected that it will remain robust in the future as the demand for data centers as well as construction industry supplying them is expected to continue to grow with the help of developing technology.

Active Key Players in the Data Center Construction Market

Turner Construction Company (USA)

DPR Construction (USA)

AECOM (USA)

Schneider Electric (France)

M. A. Mortenson Company (USA)

Arup (United Kingdom)

Brasfield & Gorrie, L.L.C. (USA)

CORGAN (USA)

Currie & Brown Holdings Limited (United Kingdom)

Fortis Construction (USA)

Gensler (USA)

Holder Construction Group LLC (USA)

Jacobs (USA)

ROGERS-O’BRIEN CONSTRUCTION COMPANY LTD (USA)

Skanska (Sweden)

Structure Tone Organization (USA)

The Boldt Company (USA)

Other Active Players

Chapter 1: Introduction

 1.1 Scope and Coverage

Chapter 2:Executive Summary

Chapter 3: Market Landscape

 3.1 Market Dynamics

  3.1.1 Drivers

  3.1.2 Restraints

  3.1.3 Opportunities

  3.1.4 Challenges

 3.2 Market Trend Analysis

 3.3 PESTLE Analysis

 3.4 Porter’s Five Forces Analysis

 3.5 Industry Value Chain Analysis

 3.6 Ecosystem

 3.7 Regulatory Landscape

 3.8 Price Trend Analysis

 3.9 Patent Analysis

 3.10 Technology Evolution

 3.11 Investment Pockets

 3.12 Import-Export Analysis

Chapter 4: Data Center Construction Market by Infrastructures (2018-2032)

 4.1 Data Center Construction Market Snapshot and Growth Engine

 4.2 Market Overview

 4.3 Electrical Infrastructure

  4.3.1 Introduction and Market Overview

  4.3.2 Historic and Forecasted Market Size in Value USD and Volume Units

  4.3.3 Key Market Trends, Growth Factors, and Opportunities

  4.3.4 Geographic Segmentation Analysis

 4.4 Mechanical Infrastructure

 4.5 General Construction

Chapter 5: Data Center Construction Market by Type (2018-2032)

 5.1 Data Center Construction Market Snapshot and Growth Engine

 5.2 Market Overview

 5.3 Tier-I and Tier-II

  5.3.1 Introduction and Market Overview

  5.3.2 Historic and Forecasted Market Size in Value USD and Volume Units

  5.3.3 Key Market Trends, Growth Factors, and Opportunities

  5.3.4 Geographic Segmentation Analysis

 5.4 Tier-III

 5.5 Tier-IV

Chapter 6: Data Center Construction Market by End User (2018-2032)

 6.1 Data Center Construction Market Snapshot and Growth Engine

 6.2 Market Overview

 6.3 BFSI

  6.3.1 Introduction and Market Overview

  6.3.2 Historic and Forecasted Market Size in Value USD and Volume Units

  6.3.3 Key Market Trends, Growth Factors, and Opportunities

  6.3.4 Geographic Segmentation Analysis

 6.4 IT and Telecommunications

 6.5 Government and Defense

 6.6 Healthcare

 6.7 Others

Chapter 7: Company Profiles and Competitive Analysis

 7.1 Competitive Landscape

  7.1.1 Competitive Benchmarking

  7.1.2 Data Center Construction Market Share by Manufacturer (2024)

  7.1.3 Industry BCG Matrix

  7.1.4 Heat Map Analysis

  7.1.5 Mergers and Acquisitions  

 7.2 SCHNEIDER ELECTRIC SE (FRANCE)

  7.2.1 Company Overview

  7.2.2 Key Executives

  7.2.3 Company Snapshot

  7.2.4 Role of the Company in the Market

  7.2.5 Sustainability and Social Responsibility

  7.2.6 Operating Business Segments

  7.2.7 Product Portfolio

  7.2.8 Business Performance

  7.2.9 Key Strategic Moves and Recent Developments

  7.2.10 SWOT Analysis

 7.3 BELDEN INC. (UNITED STATES)

 7.4 CISCO SYSTEMS INC. (UNITED STATES)

 7.5 CHATSWORTH PRODUCTS (UNITED STATES)

 7.6 DELL INC. (UNITED STATES)

 7.7 HEWLETT PACKARD DEVELOPMENT LP (UNITED STATES)

 7.8 ORACLE CORPORATION (UNITED STATES)

 7.9 RITTAL (GERMANY)

 7.10 FUJITSU LIMITED (JAPAN)

 7.11 VERTIV GROUP CORP. (UNITED STATES)

 7.12 SOCOMEC (FRANCE)

 7.13 TOSHIBA CORPORATION (JAPAN)

 7.14 VERTIV CO. (UNITED STATES)

 7.15 XIAMEN KEHUA HENGSHENG CO. LTD (CHINA)

 7.16 OTHERS ACTIVE KEY PLAYERS

 7.17

Chapter 8: Global Data Center Construction Market By Region

 8.1 Overview

 8.2. North America Data Center Construction Market

  8.2.1 Key Market Trends, Growth Factors and Opportunities

  8.2.2 Top Key Companies

  8.2.3 Historic and Forecasted Market Size by Segments

  8.2.4 Historic and Forecasted Market Size by Infrastructures

  8.2.4.1 Electrical Infrastructure

  8.2.4.2 Mechanical Infrastructure

  8.2.4.3 General Construction

  8.2.5 Historic and Forecasted Market Size by Type

  8.2.5.1 Tier-I and Tier-II

  8.2.5.2 Tier-III

  8.2.5.3 Tier-IV

  8.2.6 Historic and Forecasted Market Size by End User

  8.2.6.1 BFSI

  8.2.6.2 IT and Telecommunications

  8.2.6.3 Government and Defense

  8.2.6.4 Healthcare

  8.2.6.5 Others

  8.2.7 Historic and Forecast Market Size by Country

  8.2.7.1 US

  8.2.7.2 Canada

  8.2.7.3 Mexico

 8.3. Eastern Europe Data Center Construction Market

  8.3.1 Key Market Trends, Growth Factors and Opportunities

  8.3.2 Top Key Companies

  8.3.3 Historic and Forecasted Market Size by Segments

  8.3.4 Historic and Forecasted Market Size by Infrastructures

  8.3.4.1 Electrical Infrastructure

  8.3.4.2 Mechanical Infrastructure

  8.3.4.3 General Construction

  8.3.5 Historic and Forecasted Market Size by Type

  8.3.5.1 Tier-I and Tier-II

  8.3.5.2 Tier-III

  8.3.5.3 Tier-IV

  8.3.6 Historic and Forecasted Market Size by End User

  8.3.6.1 BFSI

  8.3.6.2 IT and Telecommunications

  8.3.6.3 Government and Defense

  8.3.6.4 Healthcare

  8.3.6.5 Others

  8.3.7 Historic and Forecast Market Size by Country

  8.3.7.1 Russia

  8.3.7.2 Bulgaria

  8.3.7.3 The Czech Republic

  8.3.7.4 Hungary

  8.3.7.5 Poland

  8.3.7.6 Romania

  8.3.7.7 Rest of Eastern Europe

 8.4. Western Europe Data Center Construction Market

  8.4.1 Key Market Trends, Growth Factors and Opportunities

  8.4.2 Top Key Companies

  8.4.3 Historic and Forecasted Market Size by Segments

  8.4.4 Historic and Forecasted Market Size by Infrastructures

  8.4.4.1 Electrical Infrastructure

  8.4.4.2 Mechanical Infrastructure

  8.4.4.3 General Construction

  8.4.5 Historic and Forecasted Market Size by Type

  8.4.5.1 Tier-I and Tier-II

  8.4.5.2 Tier-III

  8.4.5.3 Tier-IV

  8.4.6 Historic and Forecasted Market Size by End User

  8.4.6.1 BFSI

  8.4.6.2 IT and Telecommunications

  8.4.6.3 Government and Defense

  8.4.6.4 Healthcare

  8.4.6.5 Others

  8.4.7 Historic and Forecast Market Size by Country

  8.4.7.1 Germany

  8.4.7.2 UK

  8.4.7.3 France

  8.4.7.4 The Netherlands

  8.4.7.5 Italy

  8.4.7.6 Spain

  8.4.7.7 Rest of Western Europe

 8.5. Asia Pacific Data Center Construction Market

  8.5.1 Key Market Trends, Growth Factors and Opportunities

  8.5.2 Top Key Companies

  8.5.3 Historic and Forecasted Market Size by Segments

  8.5.4 Historic and Forecasted Market Size by Infrastructures

  8.5.4.1 Electrical Infrastructure

  8.5.4.2 Mechanical Infrastructure

  8.5.4.3 General Construction

  8.5.5 Historic and Forecasted Market Size by Type

  8.5.5.1 Tier-I and Tier-II

  8.5.5.2 Tier-III

  8.5.5.3 Tier-IV

  8.5.6 Historic and Forecasted Market Size by End User

  8.5.6.1 BFSI

  8.5.6.2 IT and Telecommunications

  8.5.6.3 Government and Defense

  8.5.6.4 Healthcare

  8.5.6.5 Others

  8.5.7 Historic and Forecast Market Size by Country

  8.5.7.1 China

  8.5.7.2 India

  8.5.7.3 Japan

  8.5.7.4 South Korea

  8.5.7.5 Malaysia

  8.5.7.6 Thailand

  8.5.7.7 Vietnam

  8.5.7.8 The Philippines

  8.5.7.9 Australia

  8.5.7.10 New Zealand

  8.5.7.11 Rest of APAC

 8.6. Middle East & Africa Data Center Construction Market

  8.6.1 Key Market Trends, Growth Factors and Opportunities

  8.6.2 Top Key Companies

  8.6.3 Historic and Forecasted Market Size by Segments

  8.6.4 Historic and Forecasted Market Size by Infrastructures

  8.6.4.1 Electrical Infrastructure

  8.6.4.2 Mechanical Infrastructure

  8.6.4.3 General Construction

  8.6.5 Historic and Forecasted Market Size by Type

  8.6.5.1 Tier-I and Tier-II

  8.6.5.2 Tier-III

  8.6.5.3 Tier-IV

  8.6.6 Historic and Forecasted Market Size by End User

  8.6.6.1 BFSI

  8.6.6.2 IT and Telecommunications

  8.6.6.3 Government and Defense

  8.6.6.4 Healthcare

  8.6.6.5 Others

  8.6.7 Historic and Forecast Market Size by Country

  8.6.7.1 Turkiye

  8.6.7.2 Bahrain

  8.6.7.3 Kuwait

  8.6.7.4 Saudi Arabia

  8.6.7.5 Qatar

  8.6.7.6 UAE

  8.6.7.7 Israel

  8.6.7.8 South Africa

 8.7. South America Data Center Construction Market

  8.7.1 Key Market Trends, Growth Factors and Opportunities

  8.7.2 Top Key Companies

  8.7.3 Historic and Forecasted Market Size by Segments

  8.7.4 Historic and Forecasted Market Size by Infrastructures

  8.7.4.1 Electrical Infrastructure

  8.7.4.2 Mechanical Infrastructure

  8.7.4.3 General Construction

  8.7.5 Historic and Forecasted Market Size by Type

  8.7.5.1 Tier-I and Tier-II

  8.7.5.2 Tier-III

  8.7.5.3 Tier-IV

  8.7.6 Historic and Forecasted Market Size by End User

  8.7.6.1 BFSI

  8.7.6.2 IT and Telecommunications

  8.7.6.3 Government and Defense

  8.7.6.4 Healthcare

  8.7.6.5 Others

  8.7.7 Historic and Forecast Market Size by Country

  8.7.7.1 Brazil

  8.7.7.2 Argentina

  8.7.7.3 Rest of SA

Chapter 9 Analyst Viewpoint and Conclusion

9.1 Recommendations and Concluding Analysis

9.2 Potential Market Strategies

Chapter 10 Research Methodology

10.1 Research Process

10.2 Primary Research

10.3 Secondary Research

Q1: What would be the forecast period in the Data Center Construction Market research report?

A1: The forecast period in the Data Center Construction Market research report is 2025-2032.

Q2: Who are the key players in the Data Center Construction Market?

A2: Turner Construction Company (USA), DPR Construction (USA), AECOM (USA), Schneider Electric (France), M. A. Mortenson Company (USA), Arup (United Kingdom), Brasfield & Gorrie, L.L.C. (USA), CORGAN (USA), Currie & Brown Holdings Limited (United Kingdom), Fortis Construction (USA), Gensler (USA), Holder Construction Group LLC (USA), Jacobs (USA), ROGERS-O’BRIEN CONSTRUCTION COMPANY LTD (USA), Skanska (Sweden), Structure Tone Organization (USA), The Boldt Company (USA) and Other Active Players.

Q3: What are the segments of the Data Center Construction Market?

A3: The Data Center Construction Market is segmented into By Infrastructure (Electrical Infrastructure, Mechanical Infrastructure, General Construction), Type (Tier-I And Tier-II, Tier-III, And Tier-IV), End-User (BFSI, IT And Telecommunications, Government And Defense, Healthcare). By Region, it is analyzed across North America (U.S.; Canada; Mexico), Eastern Europe (Russia; Bulgaria; The Czech Republic; Hungary; Poland; Romania; Rest of Eastern Europe), Western Europe (Germany; UK; France; The Netherlands; Italy; ; Spain; Rest of Western Europe), Asia-Pacific (China, India, Japan, South Korea, Malaysia, Thailand, Vietnam, The Philippines, Australia, New Zealand, Rest of APAC), Middle East & Africa (Türkiye, Bahrain, Kuwait, Saudi Arabia, Qatar, UAE, Israel, South Africa), South America (Brazil; Argentina, Rest of SA.).

Q4: What is the Data Center Construction Market?

A4: The data center construction market encompasses the activities associated with the development, construction, design, and upkeep of data centers. These establishments are crucial for the housing of networking apparatus, computing systems, storage, and other components required for data management and processing. The market comprises a wide range of products and services, such as security infrastructure, site selection, architecture, power supply, and ventilation systems. The data center construction market is undergoing substantial expansion due to the rising demand for cloud computing and digital services. This growth is fueled by various factors, including the proliferation of IoT devices, the expanding volume of data, and the necessity for streamlined data management solutions.

Q5: How big is the Data Center Construction Market?

A5: Data Center Construction Market Size is Valued at USD 278.72 Billion in 2023 and is Projected to Reach USD 443.63 Billion by 2032, Growing at a CAGR of 5.30% From 2024-2032.

How to Buy a Report from eminsights.jp

On the product page, choose the license you want: Single-User License, Multi-User License or Enterprise License.

If you required report in your native language, then you can click on Translated Report button and fill out the form with report name and language you want, then our team will contact you as soon as possible.

Click the Buy Now button.

You will be redirected to the checkout page. Enter your company details and payment information.

Click Place Order to complete the purchase.

Confirmation: You’ll receive an order confirmation and our team will contact you shortly with your ordered report.

If you have any questions, fill out the contact form below or email us at bizdev@eminsights.net.

Thank you for choosing eminsights.jp!